Residential
Page 22
of 33
Previous 1-9 10-19 20 21 22 23 24 25 26 27 28 29 30-33 Next
Eco Detached House at Tarleton, Lancashire
Started: 7th July 2008
Completed: 30th July 2008
Chris & Sarah Brookes were looking to build an energy efficient house and maximise the roof space to its maximum potential. The use of SIPs fulfilled both these targets.
More details
Detached SIPS Eco House, Bishop Monkton
Started: 16.6.08
Completed: 3.7.08
The client has built in his existing garden. The architect's brief was to build an energy efficient five bedroomed house over four floors. The use of SIPs has enabled the client to achieve all his requirements.…
More details
Plot 2 Eco Friendly detached House at Long Riston
Started: 26th May 2008
Completed: 13th June 2008
This is the second property to be built by Roger Coates of Greenline Homes. These two speculatively built houses offer the latest in eco - building. Local MP Graham Stuart is pictured here examining the…
More details
Page 22
of 33
Previous 1-9 10-19 20 21 22 23 24 25 26 27 28 29 30-33 Next